background image

21-07-2015

5

6

Mount a ledger as the 

first 

guard rail

 in the 1st ro-

sette 0.5m above the plat-
form stair. Subsequently, 
mount your 2

nd

 

guard rail 

0.5m higher. Place 2 stairway 
guard rail adapters at a height 
of 0.5 and 1.0m.

7

Slide the  

internal 

guard rail

 over internal 

beam of the platform stair 
and srew on the bolt-nut 
connections. Place the  

stair 

guard rail

 at the top edge 

over the ledgers and at the 
bottom over the guard rail 
adapters. Knock the wedge 
connections with a hamer.

8

Fix 

diagonal braces

 all 

4 sides. Insert the wedges in 
one of the big holes of the ro-
sette. Mounting the first dia-
gonal in place of the bottom 
platform 0.5m heigher, result 
in a better passage.

6

7

8

ASSEMBLY INSTRUCTIONS

Summary of Contents for FAST FIX

Page 1: ...FAST FIX ACCESS LADDERS ASSEMBLY GUIDE AS9999 323 07 2015...

Page 2: ...FAST FIX system scaffold is tested according to the norms NBN EN 12810 1 NBN EN 12810 2 NBN EN 12811 1 NBN EN 1288 2 NBN 1288 3 This means that the AFIX FAST FIX scaffold may be used in Austria Belgi...

Page 3: ...l or destroyed P Study the FAST FIX assembly and user guide 1a Fit the collars over the adjustable base plates and swivelthewing nut 50mm upwards 1b Place the complete base plane Connect collars using...

Page 4: ...INSTRUCTIONS 3 Place the 3m standards in the collars of the base 4 At a height of 2m fit ledgers in longitudinal and cross direction 5 Place the first alu plat form stair and slide it to the outside...

Page 5: ...il over internal beam of the platform stair and srew on the bolt nut connections Place the stair guard rail at the top edge over the ledgers and at the bottom over the guard rail adapters Knock the we...

Page 6: ...ach 3 0m standard 10 Mount the necessary ledgers at 2 0m above the 1st platform stair 11 Mount the next plat form stair in opposite direc tion 12 Mount at one side 2 led gers at 0 5 an 1 0m above the...

Page 7: ...ard rails are secured 14 Fix diagonal braces all 4 sides Repeat step 9 14 un til you reach the required height 15 Mount 2 steel decks next to the platform stair Important Secure every deck with lock a...

Page 8: ...dder to comply the basic rules CONSTRUCTION VARIANTS A when you need a access ladder who can lift up secure the standards with locking clips Afix advise customers to use standards with dismantable spi...

Page 9: ...stik Genel M d rl k binas VD TUZLA VN 0080773715 S C L NO 781569 T l 90 216 639 40 08 Fax 90 0216 639 40 09 E mail info afixgroup com Marokko Hayati AVCI Route de Sidi Bouzid O C P El Jadida T l 212 5...

Reviews: