Installation
19
1 2 3 4 5 6 7 8
4.3.3 Meter Connection
Meter are used to detect current power direction of the local load and the grid.
The output control function of the inverters will be activated based on the
detected data.
Install the single-phase Meter
Grid
Afore Single-phase Meter
Afore Single-phase Meter
PV Inventer
Main
Breaker
Load
TV
Grid
Inverter
L N
ACL
ACN
PIN
Assignment
PIN
3-8
1
2
RS485 B ( 25 )
RS485 A ( 24 )
/