Power ON/OFF
31
• Turn on DC switch.
• After LCD lighting, hybrid inverter should be set following Chapter 5.3 at the
first time.
• When inverter running under normal mode, Running indicator will light up(Ref.
to Chapter 5.1).
• Turn off DC switch ( in hybrid inverter) and all extra-breaker.
Please check the following requirements before testing:
• Installation location is suitable according to Chapter 4.1.3.
• All electrical wires are connected tightly, including PV modules, battery and
AC side(Such as the grid side, EPS side, Gen side).
• Earth line and Smart meter/CT line are connected.
• AF-DF hybrid inverters should be set according to the required local grid
standard.
• More information please contact with Afore or distributors.
6. Power ON/OFF
7. Maintenance & Trouble Shooting
6.1 Power ON
Periodically maintenance are necessary, please follow steps as below.
• AC connection(Grid and EPS) : twice a year
• Battery connection: twice a year
• Earth connection: twice a year
• Heat sink: clean with dry towel once a year
7.1 Maintenance
Restart Hybrid inverter, please follow steps as below:
• Shutdown the inverter Ref. to Chapter6.2.
• Start the inverter Ref. to Chapter 6.1.
6.3 Restart
The fault messages are displayed when fault occurs, please check trouble
shooting table and find related solutions.
7.2 Trouble Shooting
6.2 Power OFF
Note:
Hybrid inverter should be restarted after 5 minutes.