12
Commissioning
EN
ProCalida® IN 1½
6
Commissioning
6.1
Commissioning the product
1. Connect a hose to the boiler filling
and drain valve KFE and open the
boiler filling and drain valve KFE.
2. Open the return valve of the first
heating circuit (2). Open the flow
valve of the first heating circuit (3).
Close all other valves (4).
3. Fill the heating circuit with a max-
imum of 5 bar and flush it.
4. Close the flow valve and the
return valve of the filled heating
circuit.
5. Repeat the procedure (filling and
flushing, steps 2 to 4) for all other
heating circuits.
6. Vent the system at the boiler filling
and drain valve KFE (4).
1
2
1
3
4
Summary of Contents for ProCalida IN 1 1/2
Page 11: ...11 Montage DE ProCalida IN 1 5 2 Produkt montieren Klick ...
Page 16: ...16 Gewährleistung DE ProCalida IN 1 ...
Page 27: ...11 Mounting EN ProCalida IN 1 5 2 Mounting the product Click ...
Page 32: ...16 Warranty EN ProCalida IN 1 ...
Page 43: ...11 Montage FR ProCalida IN 1 5 2 Montage du produit Clic ...
Page 48: ...16 Garantie FR ProCalida IN 1 ...
Page 59: ...11 Montaggio IT ProCalida IN 1 5 2 Montaggio del prodotto Clic ...
Page 64: ...16 Garanzia IT ProCalida IN 1 ...