DIRECT VENT INSTALLATION
1. Flue drilling point. Position of the hole through the wall
should be as Fig. 7.
2. Assemble the flue elbow flue connector and flue as
shown in Fig. 8 ensuring that the seals are in position.
3. Cut flue pipe to length ensuring that it protrudes
through the wall a minimum of 10mm.
4. Seal around hole with cement and fit cover plate and
terminal guard.
8
THE FLUE
FIG. 7
FIG. 8
DESN 511300
DESN 511301
Summary of Contents for Coalbrookdale Little Wenlock Gas Power Flue
Page 20: ...19 SERVICING AND REPLACEMENT PARTS FIG 29 DESN 511315 ...
Page 36: ...11 ...