Page
8
of
34
Essential tools
Before carrying out work on the appliance, the power supply MUST be
isolated and tested for safe electrical isolation.
Always protect the cooker and work area before carrying out any work on the appliance, and always
inspect the cooker for any existing damage before starting work.
When undertaking maintenance work on this appliance, the engineer should ensure the following
tools are available
•
Multi meter
•
Clamp meter
•
Insulation resistance tester
•
Tool kit
•
Torque driver with screwdriver bits
•
Laptop with the TEK Vision software installed.
•
TEK Vision connection key - (AE4M280824)
•
Torque setting chart
•
Hob support bars - (AE4M280399)
The electrical connections on the Aga Er7 must be tightened by the use of a torque screwdriver,
please see the table on the next page for the relevant settings.
Torque screwdriver settings
Torque Setting NM
Product
AREA
2
Er7
Oven element sub assembly
0.8 (80 cNm) Initial connection.
0.6 (60 cNm) Retighten.
Er7
14 way terminal block connection on both PCB and
element sides
2
Er7
Mains supply cable to trident ( NUT)
2
Er7
Trident onto mains terminal block
0.6 (60 cNm)
Er7
Vent fan terminal block
0.65 ( 65cNm )
Er7
Cable clamps
1.0 + 0.2 / - 0.0
Er7
Hotplate
0.8
Er7 150
Terminal Connections
Summary of Contents for RANGEMASTER eR7
Page 29: ...Page 29 of 34 Wiring schematic North America...
Page 30: ...Page 30 of 34 AGA Hotcupboard DESN 517488...
Page 31: ...Page 31 of 34...
Page 32: ...Page 32 of 34...
Page 33: ...Page 33 of 34...