7
Figure 6-7
Figure 6-8
Frame Standing
Leveling the Ports
10.
After leveling the fixed end, check the upper rail to ensure it is level. The plate hanger on the
upper rail must also be level in order for the plates to hang correctly.
11.
Once the upper rail is level, the rail bolts should be checked to ensure they are fully tightened.
12.
To install the follower it is necessary to remove the roller. To remove the follower roller, remove
one of the snap rings on the roller pin, then slide the pin out and remove the roller.
13.
The follower is installed using a lifting sling. The follower is wrapped with the sling in a cinch
configuration and tilted into position using a forklift truck (figure 6-9). After the follower is over
the bottom rail, stand the follower upright and re-install the roller and pin. Secure the pin with a
snap ring.
Figure 6-9
Follower Installation
14.
Install any terminals using the same procedure as described for the follower.