3-1 FRAME ASSEMBLY 11’ THROUGH 27’
3-1.1
No assembly is needed for the SF4800
Soil Finisher frame. However, it needs to be
placed on stands approximately 36" high in
an open level area. If your Soil Finisher is
equipped with frame extensions, see
Section
3-4 for proper installation procedures.
WARNING
DO NOT ATTEMPT TO LIFT HEAVY
PARTS (SUCH AS THE FRAME, DISC
GANGS, ROCK SHAFT, AND PULL
HITCH) MANUALLY. USE A HOIST OR
A FORK LIFT TO MOVE THESE
PARTS INTO POSITION.
3-2 FRAME ASSEMBLY 30’ THROUGH 35’
IMPORTANT
READ ALL SAFETY PRECAUTIONS AT THE
FRONT OF THE SECTION BEFORE ATTEMPT-
ING ANY OF THE FOLLOWING PROCEDURES.
IMPORTANT
SEE FIGURE 3-1 FOR PART NAMES.
3-2.1
Place frame halves on stands approxi-
mately 36" high.
3-2.2
Bolt frame halves together using 3/4-10
X 2-1/2 screws and lock nuts.
(See Figure
WARNING
DO NOT ATTEMPT TO LIFT HEAVY
PARTS (SUCH AS THE FRAME, DISC
GANGS, ROCK SHAFT, AND PULL
HITCH) MANUALLY. USE A HOIST OR
A FORK LIFT TO MOVE THESE
PARTS INTO POSITION.
3-3
Summary of Contents for Glencoe SF4800
Page 1: ...Glencoe MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL Form No 79019152 March 2001...
Page 2: ......
Page 3: ...MODEL SF4800 SOIL FINISHER OPERATOR S MANUAL PURCHASED FROM DATE ADDRESS PHONE NO SERIAL NO...
Page 4: ......
Page 11: ...2 4 Figure 2 1 11 4 Shank Placement Assembly...
Page 12: ...2 5 Figure 2 2 14 0 Shank Placement Assembly...
Page 13: ...2 6 Figure 2 3 16 8 Shank Placement Assembly 1 of 2...
Page 14: ...2 7 Figure 2 4 16 8 Shank Placement Assembly 2 of 2...
Page 15: ...2 8 Figure 2 5 19 4 Shank Placement Assembly 1 of 2...
Page 16: ...2 9 Figure 2 6 19 4 Shank Placement Assembly 2 of 2...
Page 17: ...2 10 Figure 2 7 22 0 Shank Placement Assembly 1 of 2...
Page 18: ...2 11 Figure 2 8 22 0 Shank Placement Assembly 2 of 2...
Page 19: ...2 12 Figure 2 9 24 8 Shank Placement Assembly 1 of 2...
Page 20: ...2 13 Figure 2 10 24 8 Shank Placement Assembly 2 of 2...
Page 21: ...2 14 Figure 2 11 27 4 Shank Placement Assembly 1 of 2...
Page 22: ...2 15 Figure 2 12 27 4 Shank Placement Assembly 2 of 2...
Page 23: ...2 16 Figure 2 13 30 0 Shank Placement Assembly 1 of 2...
Page 24: ...2 17 Figure 2 14 30 0 Shank Placement Assembly 2 of 2...
Page 25: ...2 18 Figure 2 15 32 8 Narrow Frame Shank Placement Assembly 1 of 2...
Page 26: ...2 19 Figure 2 16 32 8 Narrow Frame Shank Placement Assembly 2 of 2...
Page 27: ...2 20 Figure 2 17 32 8 Wide Frame Shank Placement Assembly 1 of 2...
Page 28: ...2 21 Figure 2 18 32 8 Wide Frame Shank Placement Assembly 2 of 2...
Page 29: ...2 22 Figure 2 19 35 4 Shank Placement Assembly 1 of 2...
Page 30: ...2 23 Figure 2 20 35 4 Shank Placement Assembly 2 of 2...
Page 31: ...NOTES 2 24...
Page 33: ...3 2 Figure 3 1 Frame Assembly 30 to 35...
Page 35: ...3 4 Figure 3 2 Rockshaft Installation Frame Figure 3 3 Rockshaft Installation Frame 30 and 35...
Page 37: ...3 6 Figure 3 5 Wing and Wing Extensions 17 35 Models...
Page 40: ...3 9 Figure 3 9 Fold Cylinder Bracket 17 through 27...
Page 41: ...3 10 Figure 3 10 Fold Cylinder Bracket 30 and Larger...
Page 42: ...3 11 Figure 3 11 Installation of Fittings in Manifold...
Page 43: ...3 12 Figure 3 12 Installation of Shanks and Clamps...
Page 45: ...3 14 Figure 3 14 Spring Shank Assembly Figure 3 15 Ratchet Jack Installation...
Page 46: ...3 15 Figure 3 16 Disc Gang Hydraulic Assembly...
Page 49: ...3 18 Figure 3 19 Leveling Assembly Installation...
Page 51: ...3 20 Figure 3 20 Warning Light Installation...
Page 53: ...3 22 Figure 3 21 Hydraulic Radius Rod...
Page 54: ...3 23 Figure 3 22 Rear Hitch Assembly Option...
Page 57: ...NOTES 3 26...
Page 64: ...4 7 Figure 4 6 Spike Harrow 3 and 5 Bar Figure 4 7 Spike Harrow Tilloll Style...
Page 67: ...4 10 Figure 4 11 Lubrication Schedule...
Page 69: ...NOTES 4 12...
Page 72: ...NOTES 5 3...
Page 73: ......
Page 74: ......
Page 75: ...Glencoe AGCO CORPORATION 4205 River Green Parkway Duluth Georgia 30096 Printed in U S A...