Figure 36.
Install the Motor Mount Plate
3. Pull out the underfloor flighting (10) far enough to access the two holes in the end of flighting. Fasten the
discharge flighting (11) onto the underfloor flighting (10) with the following hardware (see
):
8" Tube Unload:
two 7/16” x 2-1/4” bolts (12) and nylon locknuts (13)
10" Tube Unload:
two 1/2” x 2-3/4” bolts (12) and nylon locknuts (13)
Important
Make sure that the discharge flighting is bolted onto the underfloor flighting so that the flightings
are synchronized (the helical pattern continues across the bolted connection). If the connection is
bolted a half-rotation out of position, it will not result in proper/optimum grain flow performance
during operation.