54
BU-0101704 R3
Figure 47.
Assembled Incline
6.12. Reassemble Sump Control Shafts
To reassemble the sump control shafts, follow the reverse order of the steps in
, and ensure all bolts and nuts are tight.
6.13. Electric Motor Installation / Alignment
1. Place the electric motor (1) onto the motor mount (2) and secure with the motor mounting hardware (see
). Ensure that the motor shaft is parallel to and centered on the discharge end. Align
the ends of the motor shaft and flighting shaft with a straight edge.
2. Have a qualified electrician perform the electrical connections and wiring to the electric motor. Ensure the
requirements in
Section 2.5.1 – Electric Motor Safety on page 8
are met. See also
3. Attach the pulley guard backplate (3) to the face of the powerhead using three 3/8” x 1” bolts (4), flat
washers (5), and nylon locknuts (6). The backplate should sit flush with the head plate. Do not tighten bolts/
nuts at this time; the backplate will need to be aligned later on.
Æ
4.
For two-piece drive pulleys only:
Install the drive pulley (7A) (see
for available pulley
sizes, depending on desired flighting speed) using a 3/8” x 3” square key (8), hub (9), three bolts (11), three
lock washers (10), and set screw (12). Align the drive pulley face flush with the end of the motor shaft and
tighten. Do not tighten set screw until belts are aligned.
Æ
5.
For finished bore drive pulleys only:
Install the drive pulley (7B) (see
for available
pulley sizes, depending on desired flighting speed) using a 3/8” x 3” square key (8) and set screw (12). Align
the drive pulley face flush with the end of the motor shaft and tighten. Do not tighten set screw until belts
are aligned.
20
19
21
22
23
20
19
21
22
23
EASYFLOW2 (100 SERIES) – FARM TUBE BIN UNLOAD SYSTEM