198935 R17
23
5.3.1 Welded Hopper Make-Up Package - 14' x 35°
(P/N 234481)
Figure 4.
Welded Hopper Ladder Assembly — 14’
HOLES IN LADDER SUPPORT
CHANNELS ALIGN WITH MATING
HOLES ON THE LADDER SEGMENTS.
THIS IS THE BEST MEANS TO ALIGN
SUPPORT CHANNELS
ANGLE BRACKET
P/N 234522
DETAIL 1
BOTTOM CAGE SECTION USES
30” VERTICAL SUPPORTS
30.0”
93.9" FOR 1406 BIN
93.7” FOR 1408 BIN
LADDER
INSTALL SUPPORT CHANNELS (P/N 234487)
SO THAT FLANGES POINT OUTWARDS
USE 3/8” x 1” BOLTS TO
SECURE LADDER TO THE
SUPPORT CHANNELS
SECTION A–A
BOTTOM CAGE
HOOP (P/N 234162)
BLOT TO SC
LADDER CLIP
LADDER
LADDER SUPPORT CHANNEL
WALL SHEET
HOPPER RING BEAM
3/8” x 1¼” BOLT
A
A
NOTE:
-
HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN & BOLT WITH
MATING HOLES ON THE LADDER SEGMENT & HOPPER RING BEAM
-
SC LADDER CLIPS ARE REQUIRED AT THIS LOCATION
DETAIL 1
14.0”
SC CLIP
POSITION THE CENTRE OF
SC LADDER CLIP 14” UP
FROM HORIZONTAL SEAM
AND DRILL TWO HOLES
ON WALL SHEET CREST
Note
1.
Section 5.3.9 – Angle Bracket Attachment and Foundation Details on page 31
2.
Section 5.4.5 – Angle Bracket Attachment and Foundation Details (SSK) on page 37
HOPPER LADDER MAKE-UP PACKAGES – WIDE-CORR® GRAIN BIN