198935 R17
33
5.4.1 SeedStor-K Ladder Make-Up Package - 15' x 45°
(P/N 234536)
Figure 14.
SeedStor-K Ladder Assembly - 15'
HOLES IN LADDER SUPPORT
CHANNELS ALIGN WITH MATING
HOLES ON THE LADDER SEGMENTS.
THIS IS THE BEST MEANS TO ALIGN
SUPPORT CHANNELS
ANGLE BRACKET
P/N 234522
DETAIL 1
BOTTOM TWO CAGE SECTIONS
USES 25” & 40” VERTICAL SUPPORTS
40.0”
90.5”
25.0”
BOTTOM CAGE
HOOPS BOLT TO
SUPPORT CHANNELS
LADDER
INSTALL SUPPORT CHANNELS (P/N 234526)
SO THAT FLANGES POINT OUTWARDS
USE 3/8” x 1” BOLTS TO
SECURE LADDER TO THE
SUPPORT CHANNELS
SECTION A–A
LADDER
LADDER SUPPORT
CHANNEL
4.0”
WC
LADDER CLIP
STANDARD CAGE HOOP
(P/N 234161) BOLT TO
LADDER CLIP
WALL SHEET
DETAIL 1
A
A
POSITION LADDER CLIP 4”
UP
FROM HORIZONTAL SEAM
AND DRILL HOLES ON CREST
OF CORRUGATION.
USE 3/8” x 1” BOLT
NOTE:
-
HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN & BOLT WITH
MATING HOLES ON THE LADDER SEGMENT & HOPPER RING BEAM
-
W
C
LADDER CLIPS ARE REQUIRED AT THIS LOCATION
HOPPER LADDER MAKE-UP PACKAGES – WIDE-CORR® GRAIN BIN