5.4.3 SeedStor-K Ladder Make-Up Package - 21' x 45° and 24' x 40°
(P/N 234538)
Figure 16.
SeedStor-K Ladder Assembly - 21' and 24'
USE 3/8” x 1” BOLTS TO
SECURE LADDER &
CAGE HOOP TO THE
SUPPORT CHANNEL
LADDER
CAGE HOOP
INSTALL LADDER SUPPORT
CHANNELS (P/N 234528) SO THAT
FLANGES POINT OUTWARDS
3/8
” x
1¼
” B
O
LT
S
SECTION A
–
A
(FOR BOTH BOTTOM CAGE HOOPS)
STANDARD
CAGE HOOP
(P/N 234161)
LADDER
LADDER SUPPORT CHANNEL
WALL SHEET
HOPPER RING
BEAM
3/8” x 1¼” BOLT
A
A
NOTE:
-
HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN & BOLT WITH
MATING HOLES ON THE LADDER SEGMENT & HOPPER RING BEAM
-
NO LADDER CLIPS ARE REQUIRED AT THIS LOCATION
DETAIL 1
ANGLE BRACKET
P/N 234522
19.3”
FOR 21'
13.8
”
FOR 24'
HOLES IN LADDER SUPPORT CHANNELS ALIGN WITH
MATING HOLES ON THE LADDER SEGMENTS. THIS IS
THE BEST MEANS TO ALIGN SUPPORT CHANNELS
95.0”
FOR 21'
89.4
”
FOR 24'
48.0”
48.0”
BOTTOM TWO CAGE SECTIONS BOTH USE 48”
VERTICAL SUPPORTS (AS SHOWN)
DETAIL 1
BOTTOM TWO
CAGE HOOPS
BOLT TO
SUPPORT
CHANNELS
FOR 24’, CUT THE END OF THE SUPPORT CHANNELS
TO FIT ANGLE BRACKET, THEN FIELD DRILL TWO HOLES
AND BOLT THEM TOGETHER ON SUPPORT CHANNELS
HOPPER LADDER MAKE-UP PACKAGES – WIDE-CORR® GRAIN BIN