36
198935 R17
5.4.4 SeedStor-K Ladder Make-Up Package 27' x 40°
(P/N 234486)
Figure 17.
SeedStor-K Ladder Assembly - 27'
USE 3/8” x 1” BOLTS TO
SECURE LADDER &
CAGE HOOP TO THE
SUPPORT CHANNEL
LADDER
CAGE HOOP
INSTALL LADDER SUPPORT
CHANNELS (P/N 234493) SO THAT
FLANGES POINT OUTWARDS
3/
8”
x
1
¼
” B
O
LT
S
SECTION A–A
(FOR BOTH BOTTOM CAGE HOOPS)
LADDER SUPPORT
CHANNEL
STANDARD CAGE HOOP
(P/N 234161)
LADDER
WALL SHEET
HOPPER RING BEAM
3/8” x 1¼” BOLT
A
A
NOTE:
-
HOLES ON THE TOP OF SUPPORT CHANNELS ALIGN & BOLT
WITH MATING HOLES ON THE LADDER SEGMENT & HOPPER
RING BEAM
-
NO LADDER CLIPS ARE REQUIRED AT THIS LOCATION
DETAIL 1
ANGLE BRACKET
P/N 234522
86.4”
44.0”
BOTTOM THREE CAGE
HOOPS BOLT TO
SUPPORT CHANNELS
BOTTOM THREE CAGE SECTIONS USE 30”,
40” & 44” VERTICAL SUPPORT (AS SHOWN)
DETAIL 1
HOLES IN LADDER SUPPORT
CHANNELS ALIGN WITH MATING
HOLES ON THE LADDER SEGMENTS.
THIS IS THE BEST MEANS TO ALIGN
SUPPORT CHANNELS
40.0”
30.0”
HOPPER LADDER MAKE-UP PACKAGES – WIDE-CORR® GRAIN BIN