Maintenance
10
N1911A/1912A P-Series Power Meters User’s Guide
229
Instrument Self Test
If
is selected, the following tests are run: (These are the same
tests which are run using the
*TST?
command.)
• Test Point Voltages
• Calibrator
• Fan
• Battery
• Channel Peak Path
• Channel CW Path
• Channel DAP Check
As each test takes place, the name of the test is listed on the screen.
While a test is running, the message
Testing...
appears beside the name of
the test. As each stage of the test is completed, the
Testing...
message is
replaced by either
Passed
or
Failed
.
Figure 10-154
Self test complete
When the test is complete, the result is displayed. Press
to return to
the
Service
menu.
If the self test failed, information about the failure is displayed on the
screen.
Self Test
Done