Chapter 1 Performance Tests
Introduction
Assembly Level Service Guide
1-3
1
Complete Performance Tests
The Complete Performance Tests verify the specifications listed in
Chapter 6, “Specifications.” All tests can be performed without opening
the instrument.
Recommended Calibration Cycle
The instrument requires periodic verification of operation. Depending on
the type of use, environmental conditions, aging, and measurement
accuracy required, the instrument should be checked using the operational
verification procedure at least once every year. A full Calibration and
Performance Test should be performed each time the instrument changes
environment or if an assembly or module has been replaced.
Test Record
The results of the Operational Verification and the Complete Performance
Tests should be recorded on a copy of the Performance Test Record, located
at the end of the Complete Performance Test section in this chapter.
Summary of Contents for 53147A
Page 6: ...Contents vi Assembly Level Service Guide ...
Page 13: ...1 Performance Tests Verifying Specifications ...
Page 55: ...2 Service ...
Page 88: ...Chapter 2 Service Troubleshooting the Instrument 2 34 Assembly Level Service Guide 2 ...
Page 89: ...3 Replacing Assemblies Disassembly and Reassembly ...
Page 104: ...Chapter 3 Replacing Assemblies Removing the Power Supply 3 16 Assembly Level Service Guide 3 ...
Page 105: ...4 Replaceable Parts ...
Page 116: ...Chapter 4 Replaceable Parts Parts Identification 4 12 Assembly Level Service Guide 4 ...
Page 117: ...5 Backdating ...
Page 119: ...6 Specifications ...
Page 125: ...A Rack Mounting the Instrument ...
Page 134: ...Index Index 4 Assembly Level Service Guide Index ...