3- 18
Testing Performance
To verify trigger sensitivity
Test Internal Trigger Sensitivity
1
Press the
Save/Recall
key, then press the
Default Setup
softkey.
2
Connect the oscilloscope calibrator output to the oscilloscope
channel 1 input.
3
Verify the trigger sensitivity at 25 MHz and <10 mV/div.
a
Set channel 1
Coupling
to
DC
and
Imped
to
50 Ohm
.
a
Set the output of the calibrator to 25 MHz, and set the amplitude to about
10 mV
p-p
.
b
Press the
Autoscale
key.
c
Set the time base to 10 ns/div.
d
Set channel 1 to 5 mV/div.
e
Decrease the output of the calibrator until 1 vertical division of the signal
is displayed.
The trigger is stable when the displayed waveform is stable. If the trigger is
not stable, try adjusting the trigger level. If adjusting the trigger level makes
the trigger stable, the test still passes. If adjusting the trigger does not help,
see the “Troubleshooting” chapter. Then return here.
f
Record the result as Pass or Fail in the Performance Test Record.
4
Verify the trigger sensitivity at maximum bandwidth and
≥
10 mV/div
division.
a
Change the output of the calibrator to 500 MHz for the 54642A/42D or
350 MHz or the 54641A/41D, and set the amplitude to about 100 mV
p-p
.
b
Set the time base to 1 ns/div.
c
Set channel 1 to 100 mV/div.
d
Decrease the output of the calibrator until 0.6 vertical division of the signal
is displayed.
The trigger is stable when the displayed waveform is stable. If the trigger is
not stable, try adjusting the trigger level. If adjusting the trigger level makes
the trigger stable, the test still passes. If adjusting the trigger does not help,
see the “Troubleshooting” chapter. Then return here.
e
Record the result as Pass or Fail in the Performance Test Record.
5
Repeat this procedure for channel 2.
service.book Page 18 Wednesday, August 28, 2002 3:25 PM
Summary of Contents for 54641A
Page 4: ...iv service book Page iv Wednesday August 28 2002 3 25 PM ...
Page 7: ...1 General Information ...
Page 24: ...1 18 ...
Page 25: ...2 Preparing the Oscilloscope for Use service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 45: ...3 Testing Performance service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 66: ...3 22 service book Page 22 Wednesday August 28 2002 3 25 PM ...
Page 67: ...4 Calibrating and Adjusting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 76: ...4 10 service book Page 10 Wednesday August 28 2002 3 25 PM ...
Page 77: ...5 Troubleshooting service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 90: ...5 14 service book Page 14 Wednesday August 28 2002 3 25 PM ...
Page 91: ...6 Replacing Assemblies service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 107: ...7 Replaceable Parts service book Page 1 Wednesday August 28 2002 3 25 PM ...
Page 114: ...7 8 service book Page 8 Wednesday August 28 2002 3 25 PM ...