TROUBLESHOOT
THE
A2
POST-REGULA
TOR
Use
this
procedure
when
the
fan
is
rotating
and
the
A50
SHUTDOWN
LED
turns
on.
If
one
or
some
of
the
A2
eight
LEDs
are
not
on
steadily
,
the
corresponding
A2
power
supply
voltages
,
-15
V
,
-5
V
,
+5
V
,
+5.3
V
,
+15
VD
,
are
missing
or
are
not
enough
to
power
the
analyzer
.
The
problem
may
be
in
the
A40
pre-regulator
,
the
A50
DC-DC
Converter
,
the
A2
post-regulator
,
and
any
of
assemblies
obtaining
the
A2
post-regulator
.
1.
Check
the
A40
Pre-Regulator
See
FIND
OUT
WHY
THE
A1
+5VD
LED
IS
NO
T
ON
STEADIL
Y
section
to
verify
the
A40
Pre-Regulator
.
2.
Check
the
A50
DC-DC
Converter
See
TROUBLESHOO
T
THE
F
AN
AND
THE
A50
DC-DC
CONVERTER
section
to
verify
the
A50
DC-DC
Converter
.
3.
Remove
Assemblies
See
FIND
OUT
WHY
THE
A1
+5VD
LED
IS
NO
T
ON
STEADIL
Y
section
to
verify
the
A3,
A4,
A5,
A6
and
A60.
4.
Measure
the
A2
P
ost
Regulator
Output
V
oltages
Use
this
procedure
to
measure
all
A2
post-regulator
voltages
.
If
all
A2
output
voltages
are
within
the
limits
,
the
A2
post-regulator
is
veried
with
100%
condence
.
This
procedure
put
out
the
A2
post-regulator
from
the
analyzer
and
measure
the
voltages
on
the
A2J3
pins
.
A
pulse
generator
is
used
to
feed
the
substitute
of
the
F
AN
LOCK
signal
to
the
A2
post
regulator
.
This
purposes
not
to
shut
down
the
A50
DC-DC
converter
.
a.
Turn
the
analyzer
power
o.
b.
Remove
the
cable
from
A2J4.
c.
Remove
A2
post-regulator
from
the
analyzer
.
d.
Reconnect
the
cable
between
the
A2J4
and
the
A50J2
as
shown
in
Figure
5-11.
5-16
P
ower
Supply
T
roubleshooting
Summary of Contents for Agilent 4396B
Page 10: ......
Page 32: ......
Page 43: ...Figure 2 7 CAL OUT Level Adjustment Location Adjustments and Correction Constants 2 11 ...
Page 46: ...Figure 2 10 Comb Generator Output 2 14 Adjustments and Correction Constants ...
Page 62: ...Figure 2 26 Final Gain Adjustment Location 2 30 Adjustments and Correction Constants ...
Page 76: ...Figure 3 1 Troubleshooting Organization 3 2 T roubleshooting ...
Page 84: ......
Page 90: ...Figure 5 1 Power Supply Lines Simpli ed Block Diagram 5 2 Power Supply T roubleshooting ...
Page 107: ...Figure 5 12 Power Supply Block Diagram 1 Power Supply T roubleshooting 5 19 ...
Page 108: ...Figure 5 13 Power Supply Block Diagram 2 5 20 Power Supply T roubleshooting ...
Page 109: ...Figure 5 14 Power Supply Block Diagram 3 Power Supply T roubleshooting 5 21 ...
Page 110: ......
Page 112: ...Figure 6 1 Digital Control Group Simpli ed Block Diagram 6 2 Digital Control T roubleshooting ...
Page 124: ......
Page 126: ...Figure 7 1 Source Group Block Diagram 7 2 Source Group T roubleshooting ...
Page 160: ...Figure 8 1 Receiver Group Simpli ed Block Diagram 8 2 Receiver Group T roubleshooting ...
Page 168: ......
Page 184: ...Figure 10 6 External Test Setup 1 Figure 10 7 External Test Setup 2 10 10 Service Key Menus ...
Page 185: ...Figure 10 8 External Test Setup 3 Figure 10 9 External Test Setup 4 Service Key Menus 10 11 ...
Page 226: ...Figure 11 3 Power Supply Functional Group Simpli ed Block Diagram 11 6 Theory of Operation ...
Page 231: ...Figure 11 5 Digital Control Group Simpli ed Block Diagram Theory of Operation 11 11 ...
Page 235: ...Figure 11 6 Source Simpli ed Block Diagram Theory of Operation 11 15 ...
Page 244: ...Figure 11 7 Receiver Simpli ed Block Diagram 11 24 Theory of Operation ...
Page 249: ...Figure IDC5S11001 here Figure 11 8 4396B Source Group Block Diagram Theory of Operation 11 29 ...
Page 254: ...Figure 12 1 Top View Major Assemblies 12 4 Replaceable Parts ...
Page 290: ...Figure 12 36 Main Frame Assembly Parts 17 19 12 40 Replaceable Parts ...
Page 294: ......
Page 308: ......
Page 311: ...Figure C 1 Power Cable Supplied Power Requirement C 3 ...
Page 312: ......
Page 324: ......