Performance Tests
Introduction
2-2
Agilent E4418B/E4419B Service Guide
Introduction
The procedures in this chapter test the power meter’s electrical
performance using the specifications in Chapter 1 as the performance
standards. All tests can be performed without access to the interior of the
power meter. A simpler operational test is included in “Self Test” of the
User’s Guide.
Note
For valid performance tests, the following conditions must be met:
a. The power meter and test equipment must have a 30 minute
warm-up for all specifications.
b. The line voltage for the power meter must be 85 to 264 Vac and
the line frequency must be 50 to 440 Hz.
c. The ambient temperature must be 0
0
to 55
0
C.
4402serv.book Page 2 Tuesday, October 14, 2003 3:18 PM
Summary of Contents for E4418B
Page 19: ...1 Specifications 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...
Page 37: ...2 Performance Tests 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...
Page 69: ...3 Adjustments 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...
Page 81: ...4 Theory of Operation 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...
Page 95: ...5 Replaceable Parts 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...
Page 119: ...6 Troubleshooting 4402serv book Page 1 Tuesday October 14 2003 3 18 PM ...