To unpack a benchtop system
To unpack an E5505A benchtop system, you need the following tools:
•
Safety glasses
•
Sturdy scissors
1
Cut and remove the plastic straps that secure the shipping container
and lift the lid.
2
Remove and open the individual shipping boxes.
3
Carefully remove the contents from each box.
Inspecting the system
After unpacking a racked or benchtop system, the next step is to inspect
the shipping container and its contents thoroughly to ensure that nothing
was damaged during shipment.
Verify that all parts and materials are included in your shipment:
•
E5500 Phase Noise Measurement System software and documentation
CD- ROM
•
E5500 Software Keyword Licence Certificate
•
Recovery media kit for Microsoft® Windows XP Pro®
WA R N I N G
Do not stand in the path of a system being moved down the incline of the cabinet
ramp.
N O T E
Retain all packing material—crate, pallet, boxes, foam, etc.—for future use should you
need to move the system to another location.
WA R N I N G
Always wear safety glasses or goggles when cutting plastic straps from the
shipping container. These straps are under tension and when cut can snap and
cause injury to unprotected eyes.
N O T E
If the container or packing material is damaged, the contents should be checked both
mechanically and electrically. If the contents are damaged or defective, contact your
customer engineer through your local Agilent Technologies Service Center. Keep the
shipping materials for the transport company’s inspection.
For instructions on removing an instrument from the system, see
for return procedures.
Summary of Contents for E5505A
Page 18: ...18 E5505A Installation Guide 1 General Information ...
Page 22: ...22 E5505A Installation Guide 2 Flat Panel Display ...
Page 30: ...30 E5505A Installation Guide 3 System Interconnections ...
Page 84: ...84 E5505A Installation Guide 6 Preventive Maintenance ...
Page 96: ...96 E5505A Installation Guide A Service Support and Safety Information ...