32
E5505A Installation Guide
4
Measurement Software
Powering the System On
This section provides procedures for powering on a racked or benchtop
system. First connect your system to an appropriate AC power source,
then follow the steps below.
To power on a racked system
1
Press the system power switch (front, top right of the rack) to the on
position.
2
Verify that all instrument power switches are on.
3
Allow the system to warm up for 30 minutes.
To power on a benchtop system
1
Press the power switch on each instrument to the on position.
2
If you have the system connected to a safety power strip, turn the
strip’s power switch to the on position.
3
Allow the system to warm up for 30 minutes.
WA R N I N G
Before applying power, make sure the AC power input and the location of the
system meet the requirements given in
on page 14. Failure to do so may
result in damage to the system or personal injury.
N O T E
Warm-up Time:
The downconverter and RF source instruments contain ovenized
oscillators which must warm up for 30 minutes to produce accurate measurements.
Standby Mode:
The RF source uses a standby mode to keep the ovenized oscillator warm
when the instrument is connected (plugged in) to AC power,
even when the power switch is
in the off position
. To completely shut down the instrument, you must disconnect it from the
AC power supply.
Summary of Contents for E5505A
Page 18: ...18 E5505A Installation Guide 1 General Information ...
Page 22: ...22 E5505A Installation Guide 2 Flat Panel Display ...
Page 30: ...30 E5505A Installation Guide 3 System Interconnections ...
Page 84: ...84 E5505A Installation Guide 6 Preventive Maintenance ...
Page 96: ...96 E5505A Installation Guide A Service Support and Safety Information ...