7-80
Service Guide E8364-90026
Repair and Replacement Procedures
PNA Series Microwave Network Analyzers
Post-Repair Procedures
E8362B, E8363B, E8364B
Post-Repair Procedures
After the replacement of an assembly, you must perform the service procedures in the
order listed in
Procedures referenced in this table are located in
unless specified otherwise.
Table 7-2
Related Service Procedures
Replaced Assembly
Adjustments
and Other Procedures
Verification, Performance,
and Other Tests and Procedures
A1 keypad assembly
No adjustment needed
A1 Front Panel Keypad and RPG Test
in
A2 display assembly
No adjustment needed
A3 front panel interface
board
No adjustment needed
A1 Front Panel Keypad and RPG Test
A4 power supply
assembly
No adjustment needed
None needed
A6 SPAM board
No adjustment needed
A8 fractional-N
synthesizer board
A9 fractional-N
synthesizer board
Offset LO Adjustment
A10 frequency reference
board
10 MHz Frequency
Reference Adjustment
in
.)
A11 phase lock board
No adjustment needed
A12 source 20
3.8 GHz PMYO Frequency
Adjustment
A13 frequency offset
receiver assembly
Offset LO Adjustment
A14 system motherboard
No adjustment needed
A1 Front Panel Keypad and RPG Test
A15 CPU board
No adjustment needed
Summary of Contents for E8362B
Page 11: ...Service Guide E8364 90026 1 1 1 Safety and Regulatory Information ...
Page 19: ...Service Guide E8364 90026 2 1 2 General Product Information ...
Page 33: ...Service Guide E8364 90026 3 1 3 Tests and Adjustments ...
Page 83: ...Service Guide E8364 90026 4 1 4 Troubleshooting ...
Page 151: ...Service Guide E8364 90026 5 1 5 Theory of Operation ...
Page 185: ...Service Guide E8364 90026 6 1 6 Replaceable Parts ...
Page 269: ...Service Guide E8364 90026 7 1 7 Repair and Replacement Procedures ...
Page 351: ...Service Guide E8364 90026 8 1 8 General Purpose Maintenance Procedures ...