Running a labeling protocol
26
G5581A Microplate Labeler Quick Guide
a
Specify the number of times to run the protocol.
b
Schedule the run to start. You can start the run:
•
As soon as possible
•
On a specific date and at a specific time
c
Specify the starting barcode, if applicable. This feature requires a barcode
scanner.
CAUTION
If you select the As soon as possible option, the protocol can start to run immediately
after you complete the configuration wizard. Before you click Finish, verify that the
system is set up and the protocol is ready to run.
To monitor the progress of the run, check the
Progress
tab at the bottom of the VWorks
window.
Pausing a run
To pause and continue a run:
1
On the VWorks toolbar, click (
).
The task currently in progress finishes before the protocol pauses. The Scheduler
Paused dialog box opens.
2
When you are ready to resume the run, click
Continue
in the
Scheduler Paused
dialog box.
For details about the other options in the Scheduler Paused dialog box, see the
VWorks Automation Control User Guide
.