84
5977 Series MSD Operation Manual
3
Operating in Electron Ionization (EI) Mode
To Pump Down the MSD in EI Mode
You can also use the Local Control Panel to perform this task. See
Procedure
1
Remove the analyzer window cover (see
2
Close the vent valve by turning the knob clockwise.
.
3
Plug in the MSD power cord.
4
Press the
Power on
button on the front of the MSD.
WA R N I N G
Make sure your MSD meets all the conditions listed in the introduction to this
chapter (
) before starting up and pumping down the MSD. Failure to do so
can result in personal injury.
WA R N I N G
If you are using hydrogen as a carrier gas, do not start carrier gas flow until the
MSD has been pumped down. If the vacuum pumps are off, hydrogen will
accumulate in the MSD and an explosion may occur. Read
19 before operating the MSD with hydrogen carrier gas.
Vent valve knob
Summary of Contents for G7035A
Page 1: ...Agilent Technologies Agilent 5977 Series MSD Operation Manual ...
Page 30: ...30 5977 Series MSD Operation Manual 1 Introduction ...
Page 88: ...88 5977 Series MSD Operation Manual 3 Operating in Electron Ionization EI Mode ...
Page 170: ...170 5977 Series MSD Operation Manual 6 CI Maintenance ...
Page 171: ......