TEST SEQ. This outputs a
signal that can be programmed in a test
sequence to be high or low, or pulse (10
high or low at the end of a
sweep for a robotic part handler interface.
TEST. This outputs a
signal of the limit test results as follows:
Pass:
high
Fail:
VGA OUTPUT. This provides a video output of the analyzer display that is
capable of running a PC
VGA
monitor.
Source Group Theory
The source functional group produces a stable output signal by phase locking
a YIG oscillator to a synthesized VCO (voltage controlled oscillator). The full
frequency range of the source is generated in subsweeps by harmonic mixing.
The output is a swept or CW signal with a maximum leveled power of + 5
(-10
HP
at the front panel measurement ports (minimum -65
12-3 illustrates the operation of the source functional group.
2 Theory of Operation
Summary of Contents for HP 8719D
Page 5: ...Service Guide i 8719D 2OD 22D Network Analyzer Ra HEWLETT PACKARD...
Page 44: ...Syetem Verifkatiin and 2 9 Perfonnanm Tests...
Page 69: ...234 Syotom riiiwtiin ad Rrfonnance Tests...
Page 95: ...This page is lejt intentionally blank Adjustments and Correction Constants 3 7...
Page 100: ......
Page 128: ......
Page 130: ......
Page 164: ......
Page 165: ...4 24 artTroubleshootingHen...
Page 166: ......
Page 167: ...4 26 Start Troubleshooting Hen...
Page 168: ......
Page 169: ......
Page 170: ......
Page 172: ...Power Supply Troubleshooting Flowchart 6 2 Power Supply Troubleshooting...
Page 192: ...6 22 Power Supply Troubleshooting...
Page 193: ......
Page 196: ......
Page 197: ...64 Digital Control Troubleshooting...
Page 198: ......
Page 199: ...6 6 Digital Control Troubleshooting...
Page 200: ...Digital Control Troubleshooting 6 7...
Page 222: ...Source Troubleshooting Flowchart 7 2 Source Troubleshooting...
Page 355: ...r G I _ i 1 2 Figure 13 1 Module Exchange Procedure 1 3 4 ReplaceableParts...
Page 359: ...Major EP 8719D 20D Assemblies lbp Armu 05 134 Replaceable Parts...
Page 360: ...Major EIP 8722D Assemblies lbp I f I i d 1 I Replaceable Parts 134...
Page 362: ...Major Assemblies Bottom IL IT n I 0 l J Replaceable Parts 13 11...
Page 363: ...Major Assemblies Bottom T 13 l 2 Replaceable Parts...
Page 366: ...HP 8722D Cables Ibp I vdK we w4 WZ W4q Wih w47 sbhllld Replaceable Parts 13 l 5...
Page 369: ...Cables Bottom 13 18 Replaceable Parts...
Page 370: ...Cables Bottom Replaceable Parts 13 18...
Page 371: ...Cables Bottom 13 20 ReplaceableParts...
Page 372: ...Cables Bottom Replaceable Parts 13 21...
Page 375: ...Cables Front 13 24 Replaceable Parts...
Page 376: ...Cables Front sbtlll d Replaceable Parts 13 25...
Page 380: ...Front Panel Assembly Inside 3 PLACE Replaceable Parts 13 28...
Page 382: ...Rear Panel Assembly stolu2d Replaceable Parts 13 31...
Page 384: ...Rear Panel Assembly Option lD5 Replaceable Parts 13 33...
Page 386: ...Hardware Ibp 3 PLkCEIr i_ FL IIE 4 PLAlIE 2 I _ 2 z 1 I J ReplaceableParts 1 3 3 5...
Page 388: ...Replaceable Parts 13 37...
Page 401: ...Line Fuse Assembly Replacement and Post Repair Procedures 14 5...
Page 403: ...Covers Assembly Replacement and Post Repair Procedures 14 7...
Page 405: ...Front Panel Assembly Assembly Replacement and Pest Repair Procedures 14 g...
Page 409: ...Display Lamp and Assembly Assembly Replacement and Post Repair Procedures 14 13...
Page 413: ...Rear Panel Interface Board Assembly Assembly Replacement and Post Repair Procedures 14 17...
Page 417: ...Source Assemblies L 1 PLACES 3 4 PLACE51 Assembly Replacement and Post Repair Procedures 14 21...
Page 421: ...A7BTl Battery n i _ A EB n7ETI _ _ Assembly Replacement and Post Repair Procedures 14 25...
Page 423: ...A 15 Preregulator Assembly Assembly Replacement and Pest Repair Procedures 14 27...
Page 425: ...A19 Graphics Processor Assembly Assembly Replacement and Post Repair Procedures 14 28...
Page 427: ...A3 Disk Drive Assembly Assembly Replacement and Post Repair Procedures 14 31...
Page 435: ...Bl Fan Assembly 4 PLXE 1 II Assembly Replacement and Post Repair Procedures 14 39...
Page 458: ......
Page 459: ......
Page 460: ......
Page 461: ...A l 6 Determining System Measurement Uncertainties...