Connectors Maintenance
Check the connectors at least every six months—more often
if the instrument is used daily on a production line or in a
harsh environment.
Visually inspect the front panel connectors. The most impor-
tant connectors are those to which the DUT (device under
test) is connected, typically the RF cable end or the RF OUT
and LF OUT connectors. All connectors should be clean and
the center pins centered. The fingers of female connectors
should be unbroken and uniform in appearance. If you are
unsure whether the connectors are good, gauge the RF OUT
connectors to confirm that their dimensions are correct.
Maximum and minimum protrusion of center conductor from mating plane
Min. = 0.204 in. Max = 0.207 in.
Mating plane
Summary of Contents for Keysight N9310A
Page 34: ...28 N9310A User s Guide 2 Getting Started ...
Page 58: ...52 N9310A User s Guide 3 Using Functions ...
Page 94: ...88 N9310A User s Guide 5 Programming Fundamentals 5 Select Display a list ...
Page 106: ...100 N9310A User s Guide 5 Programming Fundamentals ...
Page 168: ...162 N9310A User s Guide 6 Subsystem Command Reference ...
Page 188: ... Agilent Technologies Inc 2006 Printed in China June 2006 N9310 90001 N9310 90001 ...