105
Making Measurements
Test Timing
Test Timing
Description
There are two aspects to test timing:
•
Error results may be displayed as short term or cumulative over the measurement
period. If short term error measurements are required, the short term period may
be selected.
•
The period of the test may be defined or controlled manually.
HOW TO:
1
Choose
on
the
display.
2
Set the SHORT TERM PERIOD to the timing required for short term results.
3
Choose the type of TEST TIMING required:
For manual control with
choose .
For a single timed measurement period started with
, choose
and choose the Test duration.
For a timed period starting at a specified time, choose
, choose the Test
duration and the test START date and time.
TIMING CONTROL
RESULTS
RUN/STOP
MANUAL
RUN/STOP
SINGLE
TIMED
SONET_Usr.bk Page 105 Wednesday, December 13, 2000 11:11 AM
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com