2
Installation
Unpacking and Component Identification
14
Seahorse XFe Analyzer Operating Manual
Unpacking and Component Identification
The XFe Analyzer system is packaged in two boxes.
Upon receipt, immediately check each box for damage. Shipping damage must
be reported to the transportation company and Agilent. See
The analyzer is shipped with protection components that must be removed prior
to use. Agilent recommends these components be removed by Agilent personnel
during installation.
To prevent damage during shipping, the instrument is shipped with a cartridge
loaded onto the probe head and lowered onto a plate on the tray. These items
must be removed prior to running the first assay. Agilent personnel will remove
these shipping protection components from the XFe Analyzer During Installation.
WARNING
The XFe Analyzer requires two people to lift and handle safely.
Each person should firmly grasp the base of the unit at opposite ends to each
other. Use OSHA standards for lifting techniques.
CAUTION
XFe Instruments must be installed by trained Agilent personnel ONLY.
Instrument/Component
Quantity
Image
XFe Instrument
1
Summary of Contents for Seahorse XFe
Page 1: ...Seahorse XFe Analyzer Operating Manual...
Page 4: ...4 Seahorse XFe Analyzer Operating Manual...
Page 12: ...1 Introduction Technical Specifications 12 Seahorse XFe Analyzer Operating Manual...
Page 38: ...4 Maintenance Additional Resources 38 Seahorse XFe Analyzer Operating Manual...
Page 39: ......