Chapter 5
111
Setting Measurement Conditions
How to Set the Measurement Point
5
. Setting
Me
asur
eme
n
t
Conditions
How to change oscillator level setup unit
Change the oscillator level setup unit by following these steps:
Step 1.
Click the mouse in the “Power” column heading to display the menu of the drop-down list
box.
NOTE
The drop-down list box menu can also be displayed by using the mouse to click the
down-arrow
to the right of the Power cell.
Step 2.
Click on a new unit name from the drop-down list box menu (Figure 5-9).
Figure 5-9
How to change oscillator level setup unit
As a result, the signal level unit of each measurement point is converted to the selected unit
(Figure 5-10).
Summary of Contents for Twelfth 4287A RF LCR
Page 8: ...8...
Page 36: ...36 Chapter2 Installation Guide Preparation for Power Supply Figure 2 17 Power cable options...
Page 114: ...114 Chapter5 Setting Measurement Conditions Setting up dc resistance Rdc measurement...
Page 250: ...250 Chapter11 Setting and Using the Control and Management Facilities System Recovery...
Page 294: ...294 AppendixA Manual Changes Manual Changes...
Page 328: ...328 AppendixF Error Messages Undefined header...