60
Chapter 3
Learning Basic Operations
Calibration and Compensation
Step 7.
Press the
key or
key on the front panel the required number of times to move the
cursor to the
Next>
button.
Step 8.
Press the
key on the front panel. The window for short calibration (Figure 3-12)
appears.
Figure 3-12
Window for short calibration
Step 9.
The outside of the 7-mm connector of the test head installed on the test fixture stand should
be turned clockwise until the connector sleeve protrudes to its full extent at the top (Figure
3-13).
Figure 3-13
How to extend 7-mm connector sleeve
Step 10.
While pressing on the short standard (0
Ω
) from the top, turn it clockwise and securely
connect it to the 7-mm terminal (Figure 3-14).
Summary of Contents for Twelfth 4287A RF LCR
Page 8: ...8...
Page 36: ...36 Chapter2 Installation Guide Preparation for Power Supply Figure 2 17 Power cable options...
Page 114: ...114 Chapter5 Setting Measurement Conditions Setting up dc resistance Rdc measurement...
Page 250: ...250 Chapter11 Setting and Using the Control and Management Facilities System Recovery...
Page 294: ...294 AppendixA Manual Changes Manual Changes...
Page 328: ...328 AppendixF Error Messages Undefined header...