Completed work
The forward superstructure has been fitted to the deck.
The electrical wiring from the superstructure has been
connected to the main circuit board. Double check that
all of the wires are in the correct sockets, and that they
are fully inserted.
Now you can carefully remove the superstructure from
the temporary support and stow it horizontally again.
Then reassemble the supports and bases
11-02
/
11-04
and
11-03
/
11-04
so that you can fit the model on its
supports again.
03
. CONNECTING THE CABLES
01
Fit the plugs on the ends of the 22 cables into the
corresponding ports on the board
84-01
. The cable
marked
B-1
fits into the port marked 1; the cable
marked
B-2
fits into port 2, and so on. Work around
the board, fitting each of the cables. The cables
should be inserted with the plain side facing away
from the deck. You may find it helpful to use
tweezers to hold the plugs and cables. Ensure that
the plugs are fully inserted. The ports marked 23 and
24 (circled) remain empty at this stage.
19
18
AGORA
MODELS
19
AGORA
MODELS