01
02
01
. PREPARATORY WORK
COMPONENTS CHECKLIST
122-01:
Port gearbox support
122-02:
Starboard gearbox
support
122-03:
Upper part
of the gearbox
122-04:
Lower part
of the gearbox
122-05:
Three cogs
122-06:
Cog
122-07:
Cog
122-08:
Cog
122-09:
Three small cogs
122-10:
Port cog and
pin housing
122-11
: Starboard cog
and pin housing
122-12:
Three pivot pins
122-13:
Three grips and
a bracket
122-14:
Two cog shafts
122-15:
Cog shaft
122-16:
Two cog shafts
122-17:
Cog shaft
Thirteen 2 x 4mm
PM
screws
Four 2 x 3mm
PM
screws
Nine 2 x 4mm
PB
screws
Seven 2 x 6mm
PB
screws
Place the port cog housing
122-10
(labelled L) in front
of the port propeller shaft
120-01
, fitting it onto the
two raised screw sockets on the keel
111-01
, as shown.
Fix the port cog housing
122-10
to the keel section
111-01
using two 2 x 4mm
PM
screws.
122-01
PM
2 x 4
PM
2 x 3
PB
2 x 4
PB
2 x 6
122-02
122-03
122-04
122-06
122-05
122-07
122-08
122-09
122-10
122-11
122-13
122-12
122-14
122-15
122-16
122-17
C
A
B
D
PM
2 x 4
122-10
120-01
111-01
111-01
122-10
PM
2 x 4
STAGE 122
THE GEARBOX FOR THE PROPELLERS
20
20
AGORA
MODELS
PB
AGORA
MODELS