Page 12
STEP 4:
Install the control handle. The control handle is shipped hanging from the valve on the handle link. See
FIGURE 7.
1. Remove the clevis pin and bow-tie cotter pin from the control handle.
2. Rotate the control handle into the operating position and secure with the clevis pin and bow-tie cotter pin removed in
step above.
(FIGURE7)
Page 15
Summary of Contents for BE-LS22TL3PT
Page 2: ......
Page 6: ......
Page 29: ...Page 22 EXPLODED DIAGRAM PARTS LIST Page 25...
Page 32: ...Page 25 Page 28...
Page 34: ...Page 27...
Page 35: ...Page 28...
Page 36: ...Page 29 Phone 1 877 588 3311 Fax 1 800 665 7334 WWW BRABEREQ COM...