background image

 

 
 

Swath Roller  

Operator Manual 

 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The Workshops 

Main Street 

Garton-on-the-Wolds 

Driffield, YO25 3ET 

Tel: 01377 259140 

Fax: 01377 259141 

Email: sales@agriweld.co.uk 

 

 

www.agriweld.co.uk 

Summary of Contents for Swath Roller

Page 1: ...1 Swath Roller Operator Manual The Workshops Main Street Garton on the Wolds Driffield YO25 3ET Tel 01377 259140 Fax 01377 259141 Email sales agriweld co uk www agriweld co uk ...

Page 2: ...3 Point Linkage Swath Roller Frame Main Assembly Page 7 Parts list Page 8 Transport Box option Assembly Page 9 Attaching detaching Transport Box or Frame Brace Page 10 Transport Box Parts List Page 11 Attaching Lid Page 12 Replacing Bearings Page 13 Connecting LED s Page 14 Connecting LED s Continued Page 15 Warranty Page 16 Stickers Page 17 C E Declaration of Conformity ...

Page 3: ...d to the risk of injury to you and others as well as damage to property and the environment NON COMPLIANCE WITH SAFETY INSTRUCTIONS CAN LEAD TO WARRANTY CLAIMS BECOMING INVALID Qualifications and Training Only personnel with the appropriate licence are authorised to use this implement Statutory minimum age limits must be observed and reliable personnel only should perform maintenance work on this ...

Page 4: ...hine provide important information and must be observed Ensure that you are familiar with the equipment controls and functions before starting work Check round the machine for any noticeable damage or missing parts before starting work It is advisable that the operator wears close fitting clothing to avoid the risk of snagging and trapping Ensure that you watch out for wandering individuals partic...

Page 5: ... it is important to ensure adequate steering and braking ability as required Ensure that any items stored in the toolboxes are secured by closing the lid Important Maintenance It is important to check all pins for wear and ensure that none show significant signs of wear or damage Keep the swath roller clean at all times It is important to grease the 2 roller bearings with all purpose grease on eit...

Page 6: ...6 Swath Roller without Transport Box Option 1 2 3 6 8 7 10 5 4 9 10 ...

Page 7: ...wath_Roller_10 1 3 Roller Bearings UCFX06 30mm Shaft 4 Hole Flange Bearing 2 4 Roller Side Plate 2020 SR_BFR_1507 2 5 Frame Brace AW_SWF_TB01 1 6 Top Link Pin 2325095KO 3 7 Bottom Link Pin Z528_123 2 8 Linch Pin LP11Z 3 9 2020 SR_BFR_Jack_Pin_01 Stand Pin 1 10 2020 SR_BFR_Jack Stand 1 11 AW_LED_AMB Amber LED 2 ...

Page 8: ...8 Transport Box Swath Roller 1 4 3 2 ...

Page 9: ...9 Attaching detaching Transport Box or Frame Brace Fig 1 Fig 2 7 8 6 9 10 7 6 5 11 Removing the frame brace prior to fitting transport box option ...

Page 10: ...ntre hole of the lifting point in the box floor This will allow for the lifting of the transport box onto the frame using a lifting strap and forklift A second person will be required to assist positioning the box into place Using the new Nylocks nuts provided with the transport box fix the box in position Fig 1 and ensure all fixings are fully tightened and that you are satisfied the box is secur...

Page 11: ...ugh hinges with M12 washers and M12 Nylocks as show to the right After the lid is fastened securely the lid stay can be fastened to the lid using the M8 x 25mm bolt M8 Washers and M8 Nylocks provided Fasteners and stay are assembled as shown below ...

Page 12: ...rolling after the fasteners have been removed Remove M16 x 55 Bolts and M16 Nylock Nuts and lift frame off the roller allowing you to remove the bearings off the roller shaft Follow steps in reverse when fitting roller back into frame Ensure all fasteners are tight before transporting or using the swath roller M16 x 55mm Bolt M16 Washer UCFX06 30mm Shaft 4 Hole Flange Bearing M16 Nylock ...

Page 13: ... WIRE LIVE POSITIVE OPTIONAL AMBER LED3DV FLASHING MARKER LIGHTS If ordered as an extra option the amber flashing LED side marker lights are set to pattern PA1 before delivery If you wish to change this you will need to work your way down the list of patterns following the instructions below before fitting the plug and connecting to the tractor 1 Using the GREY wire to make the change you will nee...

Page 14: ...Phase 2 PA7 Single Flash 150 Phase 1 PA8 Single Flash 150 Phase 2 PA9 Single Flash 75 Phase 1 PA10 Single Flash 75 Phase 2 PA11 Double Flash 150 Phase 1 PA12 Double Flash 150 Phase 2 PA13 Double Flash 75 Phase 1 PA14 Double Flash 75 Phase 2 PA15 Comet Flash 75 PA16 Action Flash PA17 Module Flash PA18 Comet Alert PA19 Action Scan PA20 Single Alert PA21 Steady High N A N A PA22 Steady Low N A N A PA...

Page 15: ...s arising from ignorance occurrences outside our control such as accidents and malicious damage and non compliance with safety instructions Any damage occurred during transit must be reported on signing for the item from the haulier to enable us to enter a claim for damages direct with the haulier WARRANTY CLAIMS FOR DAMAGE DURING TRANSIT Damage occurred during transit via an external haulier must...

Page 16: ...Machine AW_WB_AS 185 mm x 85mm Agriweld Sticker 2 AW_ST_01 Agriweld Stencil Sticker 2 Serial plate 76mmX51mm Serial plate 1 AW_GG_S Grease Nipple Sticker 2 AW_WB_CHEV 300mmX300mm Hi vis chevron stickers Transport Box option 2 AW_OM_S Operator Manual Sticker 1 ...

Page 17: ...O25 3ET Product options Transport box for Swath Roller Swath roller frame Individual Serial Number Product Description Swath Roller compression of swath to assist baling Date of Last Load Test Report N A Supplementary Information Front linkage mounted roller with transport box empty weight 430kgs Frame brace instead of transport box 280kg Authorised Signatory on Behalf of Manufacturer Name of Sign...

Reviews: