No.
name
quantity
1
caliper
1
2
#1 cone
1
#2 cone
1
#3 cone
1
#4 cone
1
3
quick nut
1
4
lead screw
1
5
reverse positioning bowl
1
6
reverse positioning bowl
cushion
1
7
balance hammer
1
8
100g balance lead
1
sales@agrotkindustrial.com
https://www.agrotkindustrial.com/
P9
OPERATION INSTRUCTIONS
3. Working Environment
●
Environment Temperature: -5
~
50
℃
●
Altitude:
≤
4000 meter
●
Relative Humidity:
≤
85
%
TWO. Installation
installationinstallation
installat
1. unpacking inspection
Check whether the parts are missing or damaged according to the packing list. If you have any questions,
please contact the supplier in time. The list details are as follows:
2.
machine installation
The equipment must be installed on a solid cement floor or similar. If the ground is not solid,
measurement error will be caused. There should be space around the equipment for easy operation. See
below: