background image

 

PREPARATION FOR INSTALLATION 

 

SAFETY INSTRUCTIONS 

 

To reduce the risk of fire, electric shock, or injury to persons, observe the following: 

 

1.  This range hood is for general ventilating use only.  Do not use it to exhaust hazardous or 

explosive materials or vapours. 

2.  This appliance must be installed by a qualified technician.  The seller declines all 

responsibility in case of failure to adhere to safety standards.  Ensure that exhausted air 
from this unit is not directed into flue that is used for venting fumes from other appliances. 

3.  Use this unit only in the manner intended by the manufacturer.   

4.  Before servicing or cleaning the unit, switch electric power off at central service panel and 

lock service panel door so as to prevent power from being switched on accidentally.  
When the power disconnecting means cannot be locked, securely fasten a prominent 
warning device to the power service panel. 

5. 

Installation work and electrical wiring must be done by qualified persons in accordance 
with all applicable codes and standards, including fire-rated construction.

 

6. 

To prevent back drafting, sufficient air is needed for proper combustion and exhausting of 
gases through the flue.  Follow heating equipment guidelines and safety standards as 
published by the local code authorities.

 

7.  When cutting or drilling into any wall or ceiling, take precautions so as to not damage 

electrical wiring. 

8.  Ducted ventilation must always be vented outside. Do not vent exhaust air into spaces 

within walls, ceilings, attics, crawl spaces or garages.  

9.  Use only metal ductwork. 

Install this hood in accordance with all requirements specified. 

 
 

WARNING 
 

This appliance requires a 120V 60 Hz electrical supply, and must be connected to an individual 
properly grounded branch circuit, protected by a 15 or 20-ampere circuit breaker or time delay 
fuse.   

 

Two people are required for installation 

 

Do not cut a joist or stud unless absolutely necessary.  If a joist or stud must be cut then a 
supporting frame must be constructed. 
 
Before making cut-outs make sure there is proper clearance within the ceiling or wall for the 
exhaust vent. 
 
Check your ceiling height and the hood height maximum before you beginning installation of your 
hood to ensure proper mounting height and clearance.

 

 

 

Summary of Contents for CI523

Page 1: ...Hood Pictured Model CW500 Installation and Operating Instructions Please read all instructions before installing and operating All wiring and installation must be in accordance with CEC NEC and local...

Page 2: ...NGE HOOD INSTALLATION INSTRUCTIONS 7 Installation Instructions 8 Electrical Grounding ISLAND RANGE HOOD INSTALLATION INSTRUCTIONS 9 Installation instructions 9 Electrical grounding instructions 11 Mou...

Page 3: ...ards including fire rated construction 6 To prevent back drafting sufficient air is needed for proper combustion and exhausting of gases through the flue Follow heating equipment guidelines and safety...

Page 4: ...W522 CW503 CW510 CI523 CI531 CI530 Width 24 30 36 30 36 30 36 30 36 36 36 36 Height Max 25 88 34 4 35 2 44 44 40 28 47 2 72 Depth 20 20 40 20 24 20 20 24 24 TOOLS AND MATERIALS REQUIRED Electrical dri...

Page 5: ...use 4 round ductwork however 6 ductwork is recommended Reduce the number of transitions and turns as much as possible If a reducer is used install a long cone shaped reducer instead of a pancake reduc...

Page 6: ...ld be no less than 28 and no more than 36 The hood must be installed at the correct mounting height Hoods mounted too low could result in heat damage Hoods mounted too high will be less effective and...

Page 7: ...ssary supports to ensure the strength of the wall is enough to hold the weight of the range hood All fastener locations must span the studs otherwise proceed as follows a Cut out drywall along marked...

Page 8: ...or injury to persons 1 Facing the front of the range hood remove the left knockout and the junction box cover and install the conduit connector in junction box 2 Run 3 wires black white and green acc...

Page 9: ...ing 6 Attach the island range hood to the support system with the included screws after adjusting the support to the required height 7 Attach duct to the top of the island range hood 8 Slip stainless...

Page 10: ...10 6 Check lights and blower operation...

Page 11: ...11...

Page 12: ...12...

Page 13: ...ainless steel filters trap residue and grease from cooking The filters should never have to be replaced but should be cleaned thoroughly every thirty to sixty days depending on cooking habits Filters...

Page 14: ...levels LED Screen Time Delay Functions 1 Turn the machine on at any speed 2 Press and hold time delay button 3 Using the power level one button scroll through and select the number of minutes you woul...

Reviews: