USE OM - JANURY 2017
10
sample fails, the entire BMG other than the HSVTC is re-rated to the latest test results.
For a BMG with multiple HSVTCs, the highest rated (SEER/HSPF or capacity) HSVTC
shall be tested.
3.18.1.3
Test Sampling Plan Failure
. When the Participant is notified of a Test
Sampling Plan failure, the Participant has seven (7) calendar days to select one (1) of
the following options for each sample that fails.
For ENERGY STAR
®
failures, refer to Section 16 of the AHRI General Operations
Manual.
3.18.2
Certified Rating Test Failures
– ICMs
.
3.18.2.1
First Sample Certified Rating Test Failure
. If an ICM Participant
’s coil
fails with a given System M
anufacturer’s Outdoor Unit, then the ICM has seven (7)
calendar days to decide to choose one of the following options:
Re-
rate all models within the failed sample’s BMG proportionate
to the failed test’s results;
Test additional samples (up to 3) to determine if the test results
meet the certified ratings. The Participant shall need to
establish the number of additional samples that shall be tested
at the time of choosing this option. All additional samples shall
need to be provided at the same time within 30 days; otherwise
the Participant forfeits this option. Additional tests shall not
count toward the number of tests that a qualified condenser can
be used. (refer to Section 3.18.1.3)
Second Sample (utilizing same model coil and different System
Manufacturer condenser). Direct AHRI to select and test a new
sample coil with an Outdoor Unit from a different System
Manufacturer. The coil shall be rated with the Outdoor Unit
selected. Expenses for obtaining another Outdoor Unit and
testing shall be paid for by the Participant.
o
If the combination passes, only the combination that failed
shall be re-rated.
o
If the combination fails, then re-rate that combination and
all the other combinations in that BMG.
Obsolete the model, which also obsoletes all models within the
corresponding BMG.
3.18.2.2
Test Sampling Plan Failure
. When the Participant is notified of a Test
Sampling Plan failure, the Participant has seven (7) calendar days to select one (1) of
the following options .
3.18.2.3
Alternate Outdoor Unit Failures.
Any ICM test selections made by
AHRI using an HSVTC alternate Outdoor Unit that fails certified ratings per Figure C2
(Appendix C) shall
be incremental to the OEM’s yearly selection. The test’s results
shall
be credited to the OEM’s following year’s selection and the test failure shall follow
the current operations manual procedure. The re-rate shall apply immediately, but
shall contribute to the
following year’s consequence for improper ratings.