AHT Cooling Systems GmbH
44
WARNING
Transport the device with floor trucks.
Risk of injury to persons during
collisions.
►
Observe the transport routes for
floor trucks.
►
Secure the cargo.
►
Floor trucks must only be operated
by trained persons.
NOTICE
•
Material damage
due to transport and storage.
►
Do not expose the device during storage and
transport to temperatures higher than 70°C
(158°F).
►
Transport and store the device only in the
position of use (transport frame).
►
If the device was still inclined during transport,
wait a minimum of 2 hours before commissioning.
►
Respect the center of gravity of the device for
safe lifting of the load with the forklift. Information is
provided on the front and back of the device
packaging.
►
Removal of the transport pallet on which the
device stands occurs only with the AHT installation
service.
►
When delivering, ensure continuous
accessibility up to the installation room. (Observe
the transit heights/widths/installation space height
and adequate shunting radii.)
6 Unpacking
Check the device for damage (bumps, scratches)
before and during unpacking. Contact the maintenance
service in case of damage (see
→
10.4).
WARNING
Disposal of packaging material and films.
Danger of suffocation.
►
Keep packaging material and foils
away from children.
►
Do not let children play with them.
WARNING
For devices of type R-290: Damage to
the refrigerant circuit. The refrigerant
can escape and create an explosive
gas/air mixture. Risk of fire.
►
Ensure good ventilation.
►
Observe the safety and warning
signs for devices with flammable
refrigerants (see
→
Chapter 1.6.2.1).
►
Contact the maintenance service
(see
→
Chapter 10.4).
CAUTION
Sharp edges of the device. Heavy
device parts. Cutting injuries to the
hands. Hands can be jammed.
►
When unpacking, take care with
fingers and hands.
►
Wear protective gloves.
NOTICE
•
Material and property damage
due to missing
parts of the device.
►
Check for loose parts in the packaging.
►
Do not dispose of loose parts. If it cannot be
determined where the loose parts belong, check
with the maintenance service (see
→
Chapter 10.4).
7 Setup and installation
The setup and installation of a device or the plant
network (assembly, sealing) can only be conducted
by qualified staff. This work must be conducted
according to the VENTO system commissioning
instructions. These instructions are available to the
qualified staff.
The installation of the device/system network and
the outdoor unit must be performed by qualified staff
in consultation with the operator.
The operator must provide the following
infrastructure in fully operational state before
delivery and installation of the devices and bears the
responsibility for these systems and interfaces to be
connected:
- Power supply (energy supply company ESC)
- Wastewater drainage for defrosting water
(condensation water connection)
- Overall market control
- DFU access for remote maintenance (optional)
For technical data for interfaces, see
→
2.2.
Technical modifications to the device can only occur
with the coordination and approval of the
manufacturer.
NOTICE
•
Material and property damage
due to congestion
of the warm exhaust air (heat accumulation).
► The exhaust air must be able to escape freely at
the top of the device.
►
Superstructures or suspended ceilings can be
attached directly to the device’s top edge, only in
agreement, with the manufacturer.
►
To blow out the warm air, at least 60 mm must
remain free between the ceiling and possibly
suspended marketing posters.
The market-side feed-in signal for the light/blind
control must be connected to the input (additional
box) on the device side for the market light control.
The connection between the devices is made with the
connecting cables for the market light control.
Fig. 6: Installation in VENTO device group (example)
Brine circuit
Outdoor unit