background image

 

Unpacking 

Unpack carefully.  This is electromechanical equipment 

and should be handled with care.  If an item appears to 

have been damaged in shipment, replace it properly in 

its carton and notify the shipper.  If any items are 

missing, notify Linear LLC.  The shipping carton is the 

safest container in which the unit may be transported.  

Save it for possible future use. 

 

Service 

If the unit ever needs repair service, the customer 

should contact Linear LLC for a return product 

authorization (RPA) and shipping instructions. 

 

Care and Maintenance 

None required. 

 

Model Designation 

MT-MWB100 

Flat panel wall mount, 10”-22” 

screens, 75x75mm and 100x100mm 

hole patterns. 

MT-MWB200 

Flat panel wall mount, 22”-42” 

screens, 100x100mm, 200x100mm, 

200x200mm hole patterns. 

 

Description 

The MT-MWB Series of monitor wall brackets are 

suitable for standard VESA compliant monitors from 10-

42” screen sizes.  The mounts are retractable to allow 

the screen to be stored against the wall and extended 

for viewing.  Both mounts include a swivel head with 

both tilt and vertical alignment adjustments. 

 

Hardware Kit (MT-MWB100) 

2 x #14 x 2.5” Screws, Cross Recessed  

2 x 10mm x 50mm Plastic Wall Anchors 

4 x M4 x 25mm Bolts, Cross Recessed 

4 x Nylon Spacers 

 

Hardware Kit (MT-MWB

2

00) 

4 x 7mm x 80mm Screws, Hex Head 

4 x 10mm x 60mm Plastic Wall Anchors 

4 x M6 x 15mm Bolts, Cross Recessed 

4 x M8 x 15mm Bolts, Cross Recessed 

 

 

 

Tools Required (MT-MWB100) 

Level 

Pozidriv #2 cross recess bit or screwdriver 

4mm Drill Bit 

10mm Drill Bit 

Drill 

 

Tools Required (MT-MWB200) 

Level 

10mm Socket 

12mm Socket 

4mm Drill Bit 

10mm Drill Bit 

Drill 

 

 

Installation – MT-MWB100 

1.

 

Remove product from packaging.  Set hardware kit 

aside. 

2.

 

Hold the mount up to the installation location and 

use the flange as a template to mark the top bolt 

hole. 

3.

 

Use a level to make sure the mount is vertical 

before marking the lower bolt hole.  Set the mount 

aside. 

4.

 

If drilling into drywall: 

a.

 

Ensure there is a stud where the bolts will go. 

b.

 

Drill pilot holes using a 4mm drill bit to a depth 

of 2.0” (50mm). 

c.

 

Hold the mount up to the wall and locate it 

over the bolt holes. 

d.

 

Do not use the plastic wall anchors. 

e.

 

Install the #14 screws using a Pozidriv #2 

(similar to Phillips) bit or screwdriver. 

5.

 

If drilling into concrete:  

a.

 

Drill pilot holes using a 10mm drill bit to a 

depth of 2.5”. 

b.

 

Hold the mount up to the wall and locate it 

over the bolt holes. 

c.

 

Insert the plastic wall anchors into the holes. 

d.

 

Install the #14 screws using a Pozidriv #2 

(similar to Phillips) bit or screwdriver. 

6.

 

Select appropriate fasteners to attach the monitor 

to the mount.  Included with the mount are four M4 

screws that are 25mm in length.  Plastic spacers are 

included in case the screws are too long for the 

monitor.  Position the spacers either between the 

bolt head and the mount, or between the mount 

Reviews: