www.airdryclotheslines.com.au
4
Step 6:
Assembling the arms/ strut mechanism
Parts required:
•
2 x 120mm bolts
•
2 x 80mm bolts
•
2 x 60mm bolts
•
6 x Nuts
•
2 x Large 45mm spacer
•
4 x Small 10mm spacer
•
2 x Arms
•
2 x Struts
–
insert 12/12 small end caps
Working from the outside to the middle, thread the
120mm bolt (A) through the arm (B) followed by the
45mm spacer (C). Insert the bolt through the top hole
on the post (D) and finishing by locking with a nut (E).
Working from the outside to the middle, thread the
80mm bolt (F) through the top of the strut (G)
followed by a 10mm spacer (H). Making sure to have
the strut spring facing backwards, thread the bolt
through the second hole on the post (D) and finishing
by locking with a nut (I).
Working from the inside to the outside, thread the
60mm bolt (L) through the hole at the bottom of the
strut (G) followed by the 10mm spacer (K). Insert the
bolt through the second hole in the arm (B) and finish by
locking with a nut (J). See Figure 6. This eliminates the
end of bolt rubbing on the posts. Tighten all nuts once
the arms section has been assembled.