PG.
INSTALLATION MANUAL
1
GM - SILVERADO 2014
www.airdesignusa.com
DATE: 08.01.2016
TAILGATE SPOILER SILVERADO 2014
PART # :
1102DNTUGM24A14
TOOLS
CHECK LIST
*
Already installed in the part
*
ITEM
DESCRIPTION
A
VHB TAPE
Included in
the parts
B
GREASE PENCIL
1 pc
C
1 pc
ADHESION PROMOTER
D
ECO DOME
1 pc
AMOUNT
DRAWING
We recommend 2 persons for installation
READ CAREFULLY BEFORE
INSTALLATION
DRIVE SLOWLY
25 mph max
DO NOT
WASH CAR
24 hrs