506878-01
Page 1 of 62
Issue 1139
This manual must be left with the homeowner for future reference.
INSTALLATION INSTRUCTIONS
A95UH2V & 95G2UHV
Warm Air Gas Furnace
Upflow/Horizontal Left Air Discharge
Direct Vent & Non-Direct Vent
This is a safety alert symbol and should never be ignored. When you see this symbol on labels or in
manuals, be alert to the potential for personal injury or death.
As with any mechanical equipment, personal injury can
result from contact with sharp sheet metal edges. Be
careful when you handle this equipment.
CAUTION
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, personal injury
or loss of life. Installation and service must be performed
by a licensed professional installer (or equivalent), service
agency or the gas supplier.
WARNING
Manufactured By
Allied Air Enterprises, Inc.
A Lennox International, Inc. Company
215 Metropolitan Drive
West Columbia, SC 29170
(P) 506878-01
*P506878-01*
Unit Dimensions ............................................................ 2
A95UH2V/95G2UHV Parts Arrangement ..................... 3
A95UH2V/95G2UHV Gas Furnace ............................... 4
Shipping and Packing List ............................................ 4
Safety Information ......................................................... 4
Use of Furnace as a Construction Heater .................... 5
General ......................................................................... 6
Shipping Bolt Removal ................................................. 9
Setting Equipment ........................................................ 9
Removing Bottom Panel ............................................. 11
Upflow Application ONLY ............................................ 11
Horizontal Application ONLY ....................................... 11
Filters .......................................................................... 13
Duct System ................................................................ 13
Pipe and Fittings Specifications .................................. 13
Canadian Applications ONLY ...................................... 14
TABLE OF CONTENTS
Joint Cementing Procedure ........................................ 14
Venting Practices ........................................................ 16
Vent Piping Guidelines ................................................ 17
Gas Piping .................................................................. 36
Electrical ..................................................................... 39
Failure Codes.............................................................. 44
Unit Start Up ................................................................ 47
Gas Valve Operation ................................................... 48
Heating Sequence of Operation ................................. 48
High Altitude Information............................................. 50
Other Unit Adjustments ............................................... 50
Blower Data................................................................. 52
Service ........................................................................ 56
Planned Service .......................................................... 58
Repair Parts List ......................................................... 59
Start Up Checklist ....................................................... 60
Summary of Contents for 95G2UHV
Page 3: ...506878 01 Page 3 of 62 Issue 1139 EXPANDED VIEW Figure 1 ...
Page 28: ...506878 01 Page 28 of 62 Issue 1139 Figure 31 FIELD SUPPLIED WALL TERMINATION ...
Page 29: ...506878 01 Page 29 of 62 Issue 1139 Figure 32 ...
Page 35: ...506878 01 Page 35 of 62 Issue 1139 Figure 47 TRAP DRAIN ASSEMBLY USING 1 2 PVC or 3 4 PVC ...
Page 46: ...506878 01 Page 46 of 62 Issue 1139 TYPICAL WIRING DIAGRAM Figure 56 ...
Page 60: ...506878 01 Page 60 of 62 Issue 1139 Start Up Performance Check List UNIT SET UP ...
Page 61: ...506878 01 Page 61 of 62 Issue 1139 UNIT OPERATION Heating Mode Cooling Mode ...