Chillers
LOGICOOL™
Chillers
31
Technical Manual : 6521355 V1.14.0 11/2016
Installation Data
UNIT LIFTING
Employ lifting specialists
Local codes and regulations relating to the lifting of this type of equipment should
be observed
Use the lifting eye bolts/lifting lugs provided
Attach lifting chains to the 4 lifting eye bolts/lifting lugs provided; each chain and eye
bolt must be capable of lifting the whole chiller
Use the appropriate spreader bars/lifting slings with the holes/lugs provided
Chains/slings MUST NOT interfere with the casing of fan assembly to avoid damage
Lift the unit slowly and evenly
If the unit is dropped, it should immediately be checked for damage and reported
to Airedale
CAUTION
Only use lifting points provided.
The unit should be lifted from the top and where possible, with all packing and protection
in position. If any other type of slinging is used, due care should be taken to ensure that
the slings do not crush the casework or coil.
A
A
A =
Minimum lifting chain length of
1500mm