Installation & Maintenance : 6259535 IM E 02/2013
Installation Data
POSITIONING
The installation position should be selected with the following points in mind:
Position on a stable and even base, levelled to ensure that the compressor
operates correctly.
Levelling should be to +/- 5mm
Where vibration transmission to the building structure is possible, fit spring anti-
vibration mounts and flexible water connections.
Observe airflow and maintenance clearances.
Pipework and electrical connections are readily accessible.
Where multiple units are installed, due care should be taken to avoid the
discharge air from each unit adversely affecting other units in the vicinity.
CAUTION
Prior to connecting services, ensure that the equipment is installed and
completely level.
C
A
500
500
Controls
Panel
Inlet /
Outlet
B
Model Size
A
B
C
URAC75
– URAC125
mm
1800
760
760
URAC150
– URAC250 (Ex. 240)
mm
2000
760
760
URAC240
– URAC450 (Ex. 250)
mm
3200
900
900