2. Maintenance
2-18
⑧
After placing the O-ring, apply oil to it.
Note:
・
Use clean oil such as new engine oil.
・
Do not let foreign matter on the O-ring.
⑨
Insert the suction control valve (SCV) into the pump
housing.
Note:
Insert the suction control valve (SCV) by hand until it
contacts the housing.
If it is hard to insert the suction control valve (SCV),
insert it while rotating it from side to side slightly.
⑩
Temporarily tighten the two suction control valve
(SCV) installing bolts.
Note:
Temporarily tighten the two bolts evenly by hand until
the suction control valve (SCV) contacts the pump
housing completely.
⑪
Fully tighten the suction control valve (SCV)
installing bolts to the specified torque.
:
61 to 96lb
・
in (6.9 to 10.8N
・
m) [70 to 110kgf
・
cm]
Note:
After tightening the two bolts, tighten again the bolt
tightened firstly.
⑫
Connect the suction control valve (SCV) connector.
⑬
Wipe off the fuel which was leaked at replacement
work.
⑭
Start the engine, and make sure there is no fuel
leaked from the installation part of the suction
control valve (SCV).
SG09050
SG09052
SG09053
Discount-Equipment.com
Summary of Contents for PDS400S-6C3
Page 1: ...www discount equipment com D i s c o u n t E q u i p m e n t c o m ...
Page 10: ...1 Specification 1 4 PC14064E Unit mm D i s c o u n t E q u i p m e n t c o m ...
Page 19: ...1 Specification 1 13 Aftercooler type A120195E D i s c o u n t E q u i p m e n t c o m ...
Page 20: ...1 Specification 1 14 1 8 Fuel Piping PC13053E D i s c o u n t E q u i p m e n t c o m ...
Page 101: ...5 3 5 2 Engine Wiring Diagram PC13087E PC13088 D i s c o u n t E q u i p m e n t c o m ...