9
1
1
2
1
1
1
1
2
2
2
2
Only AM 150 and AM 300:
4. Drill the holes for the ducts and the frame (1, 2 or
1+2) in accordance with “Dimensional Drawings”.
5. Fit the frame in a horizontal position. (1, 2 or 1+2).
3. Mark the holes for the ducts according to
“Appendix 1 Dimensional Drawings”.
4. Drill all marked holes.
AM 150 and AM 300: See below.
5. Fit the wall frame.