iRelay 460 Equipment Installation Guide
UGD-D01035
Airspan Commercial and Internal Use
3
Document Organization
Chapter
Contents
1 Introduction
Provides an overview of iR460.
2 Installing iR460
Describes how to install an iR460 unit.
3 Connecting and Managing Cables
Provides instructions on how to connect and manage earthing,
lightning protector, and power drop cables.
A Job Sheet
Provides information that aids users in performing the
installation.
B Installation Checklist
Provides an overview of the high–level steps involved in the
installation process.
C Initial Site Survey
Provides the list of requirements that helps you to make sure
that the site is ready for equipment installation.
D RFI Checklist
Provides the list of requirements that helps you to prepare for
installing an iR460 unit.
E Standard Torque Values – Metric System
Lists standard torque values.
F Torque Setting for Serratub Maxi Steel
Bands
Provides information on the recommended torque setting for
the Serratub Maxi steel bands.
G Abbreviations
Lists the abbreviations (used in this document) and their
expansions.
Related Reading
The following document contains related information:
•
iRelay 460 Product Specification
This product specification describes the design requirements and standards of iR460.