background image

OPERATING INSTRUCTIONS 

 

16 

 

Maintanance and Cleaning 

 
The AirBoy nano4 is a low maintenance machine. There may be wear that occurs over 

time due to abrasion and wear parts should be replaced when this occurs. Furthermore 

there can occur typical contamination or residues of film or dust at the AirBoy nano4. 

 
Our recommendation:  
 

After 30 roll changes

 or if required: 

1) 

Check Teflon belts and replace as the circumstances require.  

2) 

Check transport rolls regarding contamination and grip clean or replace if 

necessary.  

3) 

Check blade, see the cutting of the film, if necessary replace (page 12) 

4) 

If necessary clear the machine of contamination and residue of film. Consider also 

knife slot at air pipe, sealing block and other areas of the machine.  

Summary of Contents for Air Boy nano4

Page 1: ...nano4 OPERATION INSTRUCTIONS...

Page 2: ...ings 6 Accessories and spare parts 7 Operating instruction 8 Adjustments with control panel 10 Replacement of blade 12 Replacement of high temperature belt 13 Troubleshooting 14 Options and expandabil...

Page 3: ...oes not come into contact with liquids Do not operate the machine without the covers for the machine components Keep hair and loose clothing away from the film feed mechanism Place the machine only on...

Page 4: ...diate layer Air cushion wrapper Our standard version Polyethylene 20 m 0 8mil Type 9 8 3 AirWave wrapper 320 x 420mm 4 chambers 20 m 225 lfm 16 5 in wide 0 8 mil 740 ft 4 chambers for use as an interm...

Page 5: ...CTIONS 4 Machine Overview 1 Feeding roller 2 Tension column A and B 3 Control panel 4 Air nozzle 5 Protecting cover 6 Power switch 7 Power socket 8 Heating element 9 Teflon belt 10 Silicone wheels 11...

Page 6: ...chnical data Input Voltage Working power Speed 4 levels Weight Output Voltage Product dimensions LxWxH AC100 240V 2 5A 50 60Hz 50 96W V1 13 1 ft min V2 19 7ft min V3 26 2ft min V4 32 8ft min 6 lb DC 2...

Page 7: ...ature Air 9 7 1 V4 120 130 06 08 9 8 3 V4 120 130 32 34 from Serial No N4 120250XXX please use the following settings Standard 20 m ClimaFilm 50 Speed Temperature Air 9 7 1 V4 65 75 13 15 9 8 3 V4 65...

Page 8: ...OPERATING INSTRUCTIONS 7 Accessories and spare parts Hex key 2 pcs Teflon Belt 2 pcs Blade 1 pcs Wrench 1 pcs Screw Power cord...

Page 9: ...me 99min 59sec V4 Speed level V4 32 8ft min 050 Temperature 50 010 Air volume level 10 Further adjustments with control panel see page 10 11 1 START 2 Film In Out 1 STOP 2 Set Working Time Temperature...

Page 10: ...the film roll into the feeding roller with the air channel side down optional to increase the amount of air in the cushions pass the foil through the deflector 3 Preparation of air cushion production...

Page 11: ...Adjustments with control panel 1 Speed adjustment After pressing START machine is working with the last preset data Pressing SPEED you choose the different speeds V1 V4 Please adjust the speed accordi...

Page 12: ...lease estimate the amount of film on the roll and set the time accordingly so the machine does not run out of film during the run as this could potentially cause machine damage 2 Run time can only be...

Page 13: ...he machine and disconnect power Disconnect power to the machine by removing the power cord completely from the machine Allow the machine to cool down Step 2 Using the hex key unscrew the screws of bla...

Page 14: ...p 1 Switch off the machine and disconnect power Disconnect power to the machine by removing the power cord completely from the machine Allow the machine to cool down Step 2 Remove the protective cover...

Page 15: ...rease temperature value 2 sealing is wide and thin temperature too high lower temperature value 3 under inflation air volume value too low increase air volume value 4 during operation the foil is jamm...

Page 16: ...sales advisor for further information Mobile table solutions Bring your machine to the ideal working height compatible with Docking station Rolling basket light The rolling basket is mobile and alway...

Page 17: ...of film or dust at the AirBoy nano4 Our recommendation After 30 roll changes or if required 1 Check Teflon belts and replace as the circumstances require 2 Check transport rolls regarding contaminati...

Page 18: ...ine will be returned to you immediately once the repair is finished If you need a replacement machine the warranty period will continue from the receipt date of the first machine The warranty will not...

Page 19: ...AirBoy nano4 is compliant with the relevant harmonized standards listed according to EMC Regulations 2014 30 EU and LVD Regulations 2014 35 EU The compliance was verified by an independent specialized...

Page 20: ...ING INSTRUCTIONS 19 Support und Service If you need support advice or do you have any questions We are here for you https www airwave packaging com support AirWave Packaging Inc US www airwave packagi...

Reviews: