CLOUD ETHERNET AIRZONE PRODUCTION CONTROL BOARD (AZX6CCPWSCC)
Assembly
The production control board is supplied to be screwed to the wall. It should be placed and
mounted in accordance with the current electrotechnical regulations. For the mounting of the
main control board, follow the following steps:
•
Locate the control board close to the unit to be controlled.
•
Unscrew the cover securing the back part to the wall.
•
Make all the connections and screw the cover again.
Connection
Production control board is connected to the domotic bus of the main board.
Power supply connector
This connector powers the main control board and all the elements connected to it. Externally
powered at 110/110/230 Vac. It is connected through a 3-pin terminal. Attach the wires with the
terminal screws following the color code. For added security, secure the wires using the turret.
Important:
According to the current local and national regulations, it is mandatory to add a switch (or other element to
disconnect the system) to the external supply wiring so that a constant separation between poles is guaranteed. The system
will restart automatically if the supply is eventually turned off.
Nº
Description
Power supply
ACS
Deactivates the air conditioning through AC unit
CALOR Sets the heating semi-forced mode
FRIO
Sets the cooling semi-forced mode
STOP
Imposes the Stop mode in the system
SONDA Boiler probe
Domotic bus output 1
Domotic bus output 2 – Aerothermal gateway connection
Ethernet
O1
Cooling mode
O2
Heating mode
O3
Cooling air demand
O4
Cooling radiant demand
O5
Heating air demand
O6
Radiant heating demand
O7
Reserved for internal use