18
1. Disconnect the test leads from the meter and any
item under test.
2. Open the fuse door by loosening the screw on the
door using a Phillips head screwdriver.
3. Remove the old fuse from its holder by gently
pulling it out.
4. Install the new fuse into the holder.
5. Always use a fuse of the proper size and value
(0.5A/250V fast blow for the 400mA range).
6. Put the fuse door back in place. Insert the screw
and tighten it securely.
WARNING: To avoid electric shock, do not operate
your meter until the fuse door is in place and
fastened securely.
Summary of Contents for AMM-1009
Page 1: ......